ESET confident about 30 per cent electricity rate cut in Jamaica

The expression of confidence came from Dr Vincent Lawrence during a press briefing at Jamaica House today.
Jamalco has proposed a coal-fired co-generation facility at Halse Hall, Clarendon, supplying high steam to its refinery and 50 megawatts of power to the grid.
Meanwhile, Alpart is to build a 140 megawatt gas turbine co-generation facility which will supply steam to the St Elizabeth-based refinery and power to the JPS grid.
Lawrence has cited delays related to the change of ownership in Jamalco and contractual issues between UC Rusal and American Ethane.
But he says this should not affect the timelines.
New Base Load Plants are expected to contribute to the lowering electricity rates by approximately 30 per cent by 2018.
Unlock full access – sign up for FREE.
Key benefits
Australia replaces Malaysia to become China’s top bauxite supplier in May
Next articleAsdion wins 4 million tonne bauxite supply deal to China
Grow with
AL Circle






















