Adv
LANGUAGES
English
Hindi
Spanish
French
German
Chinese_Simplified
Chinese_Traditional
Japanese
Russian
Arabic
Portuguese
Bengali
Italian
Dutch
Greek
Korean
Turkish
Vietnamese
Hebrew
Polish
Ukrainian
Indonesian
Thai
Swedish
Romanian
Hungarian
Czech
Finnish
Danish
Filipino
Malay
Swahili
Tamil
Telugu
Gujarati
Marathi
Kannada
Malayalam
Punjabi
Urdu
21 SEPTEMBER 2017 AL CIRCLE

SPCB revokes closure notice on Vedanta’s three power plants

EDITED BY : HEENA IQBAL 1MINS READ

Vedanta today announced that the State Pollution Control Board, Odisha ('SPCB') has revoked order for closure of three units (two units of 135 MW each and one unit of 600 MW) on September 20, 2017, and hence restarted these units of power plant. The company will not need to buy the 200 MW power from external sources.

{alcircleadd}

On 13 September 2017, SPCB had directed a temporary closure of the five power plant units (three units of 135 MW each of the 1215 MW power plant, and two units of 600 MW each of the 2400 MW power plant), following a breach in the Ash Pond dyke wall at Jharsuguda.

The revocation order will help the Company get complete reliable power generation back in place, satisfying the current requirement for Smelter operations.

Tagged with:

Vedanta Energy India

Adv
Adv
Adv
Adv
Adv
Adv
Adv
EDITED BY : HEENA IQBAL 1MINS READ

Responses

Adv
Adv
Adv
Loading...
Adv
Adv
Adv
Loading...
Reports VIEW ALL
Loading...
Loading...
Business Leads VIEW ON AL BIZ
Loading...
Adv
Adv
Would you like to be
featured with us?
Loading...

AL Circle: Aluminium Ecosystem App

A proud
ASI member
© 2026 AL Circle. All rights reserved. AL Circle is not responsible for content from external sources.