Adv
LANGUAGES
English
Hindi
Spanish
French
German
Chinese_Simplified
Chinese_Traditional
Japanese
Russian
Arabic
Portuguese
Bengali
Italian
Dutch
Greek
Korean
Turkish
Vietnamese
Hebrew
Polish
Ukrainian
Indonesian
Thai
Swedish
Romanian
Hungarian
Czech
Finnish
Danish
Filipino
Malay
Swahili
Tamil
Telugu
Gujarati
Marathi
Kannada
Malayalam
Punjabi
Urdu
AL CIRCLE

Metro Mining provides further construction update for Bauxite Hills Mine

EDITED BY : 1MINS READ

Metro Mining Limited yesterday provides a construction update for the Bauxite Hills Mine. The construction work at the site is currently on schedule, and will be completed by the end of 2017.

Barge Loading Facility (BLF) fabrication commences in Cairns by CSF Steel Fabricators. The shipment to site is planned for mid-September.  Foreshore Marine has installed the tidal gauge and cyclone moorings in the Skardon River.

{alcircleadd}

 “Mining equipment has arrived on site with civil works commencing immediately to clear the Port and approved Barge Loading Facility (BLF) areas. Additional civil works including upgrading the existing roads and sediment dam works are also in progress,” the company said.


Metro’s Site Environmental Officer has arrived on the Mine site and will supervise construction activities, commence operations readiness preparation. The company has signed a deal with Falck for the provision of a paramedic and medical supplies at Bauxite Hills.

The company announced that the Minister for State Development, Natural Resources and Mines Hon Dr Anthony Lynham grants the three mining leases for the Bauxite Hills Mine.

Adv
Adv
Adv
Adv
Adv
Adv
Adv
EDITED BY : 1MINS READ

Responses

Adv
Adv
Adv
Adv
Adv
Adv
E-magazines VIEW ALL
Reports VIEW ALL
Interviews
Business Leads VIEW ON AL BIZ
Adv
Adv
Would you like to be
featured with us?
Business Cards
Featured

AL Circle News App
AL Biz App

A proud
ASI member
© 2025 AL Circle. All rights reserved.
AL Circle is not responsible for content from external sources.