TRIMET France puts continuous caster into operation

TRIMET took over the plants at the end of 2013 and has since consistently worked toward full utilization of the production capacity. The recommissioning of the continuous caster after more than five years marks an important step on the road to full utilization of the plant. Last autumn, the electrolysis production was returned to near maximum capacity with the recommissioning of production line “F.”
Unlock full access – sign up for FREE.
Key benefits
Alba wins the 2015 Green Era Award
Next articlePPS South Korea to buy 3,000t of aluminium
Grow with
AL Circle




























