Adv
LANGUAGES
English
Hindi
Spanish
French
German
Chinese_Simplified
Chinese_Traditional
Japanese
Russian
Arabic
Portuguese
Bengali
Italian
Dutch
Greek
Korean
Turkish
Vietnamese
Hebrew
Polish
Ukrainian
Indonesian
Thai
Swedish
Romanian
Hungarian
Czech
Finnish
Danish
Filipino
Malay
Swahili
Tamil
Telugu
Gujarati
Marathi
Kannada
Malayalam
Punjabi
Urdu
28 NOVEMBER 2014 AL CIRCLE

GE signs a CSA with EGA for the maintenance of its turbines

1MINS READ
Emirates Global Aluminium (EGA) today signed a long-term contractual agreement (CSA) with GE Power & Water, to insure that the GE turbines installed in the Tasweelah smelter continue to run smoothly.

The CSA will strengthen the special partnership GE already has with EGA as Tasweelah smelter is one of the first aluminium smelter sites globally where GE’s 9FA turbines were installed.

In EMAL there are nine GE 9FA turbines and four steam turbines that were installed in two phases and have helped EGA to meet the goal of reducing their carbon foot print so as to meet the regulatory requirements set by the Abu Dhabi Environmental Agency.

The CSA will extend the current contractual service agreement between EGA and GE for the three installed 9FA gas turbines as well as for the maintenance and support for the two additional 9FA units that are set aside as standby units. The contract will cover spare part requirements, repairs and field services.


Adv
Adv
Adv
Adv
Adv
Adv
Adv
1MINS READ

Responses

Adv
Adv
Adv
Loading...
Adv
Adv
Adv
Loading...
Reports VIEW ALL
Loading...
Loading...
Business Leads VIEW ON AL BIZ
Loading...
Adv
Adv
Would you like to be
featured with us?
Loading...

AL Circle: Aluminium Ecosystem App

A proud
ASI member
© 2026 AL Circle. All rights reserved. AL Circle is not responsible for content from external sources.