NewsPrimary ALDUBAL to receive fourth batch homogenising plant from Hertwich Engineering
19 NOVEMBER 2014Hertwich Press Release

DUBAL to receive fourth batch homogenising plant from Hertwich Engineering

Edited by : AL CIRCLE
1 min read
DUBAL to receive fourth batch homogenising plant from Hertwich Engineering
Dubai Aluminium from Dubai (United Arab Emirates) has ordered a batch homogenising plant from Hertwich Engineering. This is the fourth plant of its kind that Hertwich is to supply to the company. The batch homogenising plant is designed for very short heating times. A reversing air concept and regulation by flaps accelerates the heating by an estimated 20% and achieves improved temperature uniformity. The plant is fully automated, with heating being controlled by measurement of the air and metal temperatures. The furnace has a capacity of 55 t for billet diameters between 152 and 406 millimetres.

Start of production is scheduled for the third quarter of 2015.

Unlock full access – sign up for FREE.

Key benefits

Find exclusive data-driven insights and in-depth analysis
Get our daily newsletter delivered straight to your inbox
Access real-time and historical price trends from global indices
Post and respond to latest business leads
Stay ahead with alerts on learning tools
...and so much more!SIGN UP / LOGIN

Grow with
AL Circle

KNOW MORE

Responses

E-magazines

VIEW ALL
Aluminium extrusions

Turn marketplace visibility into more relevant buyer enquiries.

Boost Your Listing

Business Cards

FEATURED

VIEW ALL