NewsAluminaAltech appoints Simulus as EPCM parter for Meckering
15 MAY 2015Altech Chemicals Press Release

Altech appoints Simulus as EPCM parter for Meckering

Edited by : AL CIRCLE
2 min read
Altech appoints Simulus as EPCM parter for Meckering
Highlights
• Appointment of local company Simulus Engineering as EPCM partner for Meckering
• Simulus was instrumental in testwork and development of flowsheet
• Simulus is the key engineering contractor on the BFS

Altech Chemicals Limited is pleased to announce that it has now appointed Simulus Engineering Pty Ltd (Simulus) as its Engineering, Procurement, Construction and Management (EPCM) partner for its proposed kaolin beneficiation plant at Meckering, Western Australia.

Simulus has been the key engineering partner during the bankable feasibility study (BFS) phase of the project. The Meckering beneficiation plant will enable the initial simple wet processing of kaolin to remove oversize silica, followed by drying to reduce moisture content. The resultant upgraded kaolin will be packed into 1-2 tonne "bulka bags" for containerised shipment to Johor Baharu, Malaysia, via the port of Fremantle, Western Australia. The Meckering plant has been designed to produce approximately 18,565 tonnes of beneficiated kaolin per annum at full capacity

Simulus is a multidisciplinary engineering company that has conducted project assessments in over 25 countries around the world for over 75 companies. Simulus has laboratory test work facilities as well as process simulation capabilities which were major aspects of Altech's BFS. Simulus has previously conducted the Company's laboratory pilot plant test work and Integrated Plant Study (IPS) in 2013-2014. In addition, Simulus has been responsible for the BFS's engineering concept development, including the process flowsheet for both Meckering and Malaysia's proposed operations.

The appointment of Simulus follows the Company's 10 March 2015 announcement of M+W Group as the EPCM partner for the HPA plant in Malaysia, and the appointment of Castle Equipment Pty Ltd as mining contractor and processing plant operator for the Meckering beneficiation plant on 15 April 2015.

Unlock full access – sign up for FREE.

Key benefits

Find exclusive data-driven insights and in-depth analysis
Get our daily newsletter delivered straight to your inbox
Access real-time and historical price trends from global indices
Post and respond to latest business leads
Stay ahead with alerts on learning tools
...and so much more!SIGN UP / LOGIN

Grow with
AL Circle

KNOW MORE

Responses

E-magazines

VIEW ALL
Aluminium extrusions

Turn marketplace visibility into more relevant buyer enquiries.

Boost Your Listing

Business Cards

FEATURED

VIEW ALL