Adv
LANGUAGES
English
Hindi
Spanish
French
German
Chinese_Simplified
Chinese_Traditional
Japanese
Russian
Arabic
Portuguese
Bengali
Italian
Dutch
Greek
Korean
Turkish
Vietnamese
Hebrew
Polish
Ukrainian
Indonesian
Thai
Swedish
Romanian
Hungarian
Czech
Finnish
Danish
Filipino
Malay
Swahili
Tamil
Telugu
Gujarati
Marathi
Kannada
Malayalam
Punjabi
Urdu
20 OCTOBER 2020 AL CIRCLE

South32’aluminium production stands marginally higher at 248,000 tonnes in 1Q21

EDITED BY : HEENA IQBAL 1MINS READ

South32 Ltd reported a 1% quarter-on-quarter rise in aluminium production in the September quarter. Aluminium production stood at 248,000 tonnes in 1Q21, from 245,000 tonnes in 4Q20. The output remained unchanged year-on-year.

aluminium

{alcircleadd}

Hillside Aluminium saleable production increased by 1% quarter-on-quarter to 180,000 in the September 2020 quarter as the smelter continued to test its maximum technical capacity, despite the impact from load-shedding. The output was down 1% year-on-year.

The production guidance remains unchanged at 720,000 tonnes for FY21.

global-bauxite-industry-insights

Mozal Aluminium saleable production increased by 1% quarter-on-quarter to 68,000 tonnes in the September 2020 quarter as the smelter continued to test its maximum technical capacity, despite the impact from load-shedding. The output was also up by 1% year-on-year.

The production guidance remains unchanged at 273,000 tonnes for FY21. 


Adv
Adv
Adv
Adv
Adv
Adv
Adv
EDITED BY : HEENA IQBAL 1MINS READ

Responses

Adv
Adv
Adv
Loading...
Adv
Adv
Adv
Loading...
Reports VIEW ALL
Loading...
Loading...
Business Leads VIEW ON AL BIZ
Loading...
Adv
Adv
Would you like to be
featured with us?
Loading...

AL Circle: Aluminium Ecosystem App

A proud
ASI member
© 2026 AL Circle. All rights reserved. AL Circle is not responsible for content from external sources.