Adv
LANGUAGES
English
Hindi
Spanish
French
German
Chinese_Simplified
Chinese_Traditional
Japanese
Russian
Arabic
Portuguese
Bengali
Italian
Dutch
Greek
Korean
Turkish
Vietnamese
Hebrew
Polish
Ukrainian
Indonesian
Thai
Swedish
Romanian
Hungarian
Czech
Finnish
Danish
Filipino
Malay
Swahili
Tamil
Telugu
Gujarati
Marathi
Kannada
Malayalam
Punjabi
Urdu
AL CIRCLE

AMA delivers first potshell for Alba’s Line 6 Expansion project

EDITED BY : 1MINS READ

AMA's Structural & Mechanical Division (AMA-SMD) has supplied potshell for Alba’s line-6 aluminium smelter project. The group has delivered the first potshell for expansion project on February 12.

{alcircleadd}

Image Source: Trade Arabia

AMA Group was awarded the contract to manufacture 427 pot shells (each weighing 44 tonnes) for Alba’s Line 6 Expansion Project. The group had received the contract from International Bechtel Company (Bechtel), the engineering, procurement, and construction management (EPCM) contractor for the project.

In addition, AMA Group and Alucor (UAE) have delivered cathode ring busbars (each weighing 47 tonnes) on February 14. The AMA-Alucor joint venture company is manufacturing 24 cathode ring busbars for the project.

Haresh Patel, the general manager of AMA-SMD said: “We are looking to complete the project ahead of schedule.”

Adv
Adv
Adv
Adv
Adv
Adv
Adv
EDITED BY : 1MINS READ

Responses

Adv
Adv
Adv
Adv
Adv
Adv
E-magazines VIEW ALL
Reports VIEW ALL
Interviews
Business Leads VIEW ON AL BIZ
Adv
Adv
Would you like to be
featured with us?
Business Cards
Featured

AL Circle News App
AL Biz App

A proud
ASI member
© 2025 AL Circle. All rights reserved.
AL Circle is not responsible for content from external sources.